Customization: | Available |
---|---|
Nominal Voltage: | 768V |
Warranty: | 5 Years After Sales Service |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Working Principle of 215kwh Energy Storage Outdoor Integrated Cabinet
Electricity is stored in the battery pack via mains power/photovoltaic panels (Energy Storage Phase)Model | 768V215KWH(Liquid Cooling) |
Total energy | 215kWh,25º[email protected] |
Nominal battery voltage | 768V |
Battery working voltage range | 672~864V |
Max Charging/Discharging power | 50Hz |
AC max discharge current | 158A |
IP grade | IP54 |
Module standard | GB/T 36276,UN38.3 |
Company Profile
BAODE LIGHTING GROUP CO., LTD.
Honesty, hard work, and keeping pace with the times
Founded in 2000, Baode Lighting Group Co., Ltd. has evolved into a high-tech enterprise after over 20 years of development, specializing in R&D, design, production, engineering, service, and O&M of outdoor lighting equipment, solar/street/smart/high-pole lights, steel pipe power towers, communication towers, traffic equipment, landscape lighting, and photovoltaic intelligent applications.
The group has won Gaoyou City's "Mayor Quality Award" twice, is a Jiangsu Province "Service-oriented Manufacturing Demonstration Enterprise", and a frequent supplier for national key projects. It holds titles like Gaoyou's "Top 20 Industrial Enterprises", Yangzhou's "Top 100 Private/Industrial Enterprises", etc. Its "Luyou" brand is a "Jiangsu Famous Trademark", with products recognized as "Jiangsu Famous Brand Products". As a Jiangsu Industrial Design Center and Enterprise Technology Center, it owns over 100 patents (nearly 20 invention patents) and is a Yangzhou "Intellectual Property Advantage Enterprise".
With multiple professional qualifications (e.g., Grade-I urban road lighting contracting, Grade-I lighting design), it has passed ISO 9001/14001/45001, GB/T27922 (5-star after-sales), information security, and product certifications (CCC, CQC, EN ISO 3834-2). Collaborating with China Railway, JinkoSolar, etc., its products sell to 100+ countries and China's provinces, undertaking landmark projects like Beijing New Airport, China-North Korea Yalu River Bridge, and 200+ airport high-pole lighting projects. Upholding "integrity, diligence, and innovation", it aims to enhance core competitiveness, provide excellent services, and boost "Made in China".
FAQ
1.What advantages does it have compared to traditional split-type energy storage systems?
Integrated design: Reduces on-site installation procedures and shortens the deployment cycle (usually completed within 1-3 days).
Outdoor adaptability: Equipped with dustproof, waterproof, corrosion-resistant, and high/low temperature resistance capabilities, adapting to complex climates.
Space-saving: Eliminates the need for a separate machine room, saving land and civil engineering costs.
Higher safety: Integrates multiple protections such as fire protection, lightning protection, and insulation monitoring, with stronger system coordination.
2.What site conditions are required for installing an integrated outdoor energy storage cabinet?
- The ground must be level (cement or hardened ground is preferred) and have a load-bearing capacity that meets the equipment weight ( refer to specific product parameters for details).
- There should be no obstacles around to ensure good ventilation, and it should be far away from flammable, explosive, and corrosive substances.
- Reserved operating space (it is recommended to have ≥1.5 meters in front of the cabinet and ≥0.8 meters behind the cabinet) to facilitate maintenance and emergency operations.